|
March 2010 |
|
11th |
Flexible Pavements - Maintaining Wearing Surfaces |
Birmingham |
Book |
|
16th |
H, S & W - ICE Development Objective E2 - Site & General Safety |
Bristol |
Book |
|
17th |
Drainage Design (Foul and Surface Water) |
Cardiff |
Book |
|
18th |
Concrete Specification to BS EN 206 - 1 : 2000 AND BS 8500 : 2006 |
Slough |
Book |
|
18th |
NEC3 : Engineering & Construction Contract - Introduction |
Belfast |
Book |
|
23rd |
Site Supervision of Civil Engineering Contracts |
Slough |
Book |
|
23rd |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Bristol |
Book |
|
24th |
Designing Steel Building Structures - EC3 (2 days) |
Cardiff |
Book |
|
24th |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Bristol |
Book |
|
25th |
Value Management & Value Engineering |
Belfast |
Book |
|
25th |
NEC3 : Engineering and Construction Contract Advanced Workshop |
Birmingham |
Book |
|
25th |
Designing Steel Building Structures - EC3 (2 days) |
Cardiff |
Book |
|
25th |
Structural Masonry - Introduction |
Exeter |
Book |
|
30th |
H, S & W - ICE Development Objective E2 - Legislation |
Cardiff |
Book |
|
31st |
Design of Concrete Structures to EC2: Theory and Examples |
Glasgow |
Book |
|
April 2010 |
|
1st |
Design of Concrete Structures to EC2: Theory and Examples |
Glasgow |
Book |
|
6th |
ICE Technical Report Route [TRR] |
Slough |
Book |
|
7th |
Design of Timber Structures to Eurocode 5 - Solid Timber |
Bristol |
Book |
|
12th |
Sheet Piling and Cofferdams - Design (1.5 days) |
Cardiff |
Book |
|
13th |
Assessment & Remediation of Contaminated Land |
Bristol |
Book |
|
13th |
Sheet Piling and Cofferdams - Design (1.5 days) |
Cardiff |
Book |
|
14th |
Eurocode 2 for Bridges - Theory with Design Workshops (2-day) |
Belfast |
Book |
|
14th |
Commercial Awareness - Introductory Level |
Glasgow |
Book |
|
15th |
Practical Highway Design - Introduction |
Birmingham |
Book |
|
15th |
Design of Timber Structures to Eurocode 5 - Solid Timber |
Slough |
Book |
|
15th |
Eurocode 2 for Bridges - Theory with Design Workshops (2-day) |
Belfast |
Book |
|
15th |
ICE Technical Report Route [TRR] |
Exeter |
Book |
|
20th |
H, S & W - ICE Development Objective E2 - Legislation |
Slough |
Book |
|
21st |
CESMM3 - Civil Engineering Standard Method of Measurement |
Cardiff |
Book |
|
22nd |
Recycling Options for Pavement Maintenance |
Birmingham |
Book |
|
22nd |
Environmental Impact Assessments of Highway Schemes |
Bristol |
Book |
|
27th |
CDM Regulations 2007 and Compliance |
Slough |
Book |
|
27th |
Bills of Quantities for Highway Works |
Exeter |
Book |
|
27th |
Highway Drainage - An Overview |
Bristol |
Book |
|
28th |
Manual for Streets - Overview of the Design Document |
Glasgow |
Book |
|
28th |
CDM Regulations 2007 for Designers - Design Risk Management |
Cardiff |
Book |
|
28th |
Principles of Construction Contracts (2 days) |
Belfast |
Book |
|
29th |
Environmental Impact Assessments of Highway Schemes |
Glasgow |
Book |
|
29th |
Principles of Construction Contracts (2 days) |
Belfast |
Book |
|
29th |
Essentials of Effective Project Management |
Birmingham |
Book |
|
May 2010 |
|
4th |
NEC3 : Engineering & Construction Contract - Introduction |
Bristol |
Book |
|
4th |
H, S & W - ICE Development Objective E2 - Regulations & Codes |
Glasgow |
Book |
|
5th |
Highway Law and Management Procedures |
Cardiff |
Book |
|
11th |
Contract Law - Types of Contract |
Glasgow |
Book |
|
12th |
Temporary Works Design - Introduction |
Cardiff |
Book |
|
13th |
Basic Reinforced Concrete Detailing to BS 8110 and EC 2 |
Exeter |
Book |
|
13th |
Urban Drainage (Foul and Surface Water) |
Belfast |
Book |
|
18th |
Site Supervision of Civil Engineering Contracts |
Bristol |
Book |
|
18th |
Asphalt Technology for Civil Engineers & Civil Engineering Contractors |
Glasgow |
Book |
|
19th |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Birmingham |
Book |
|
19th |
H, S & W - ICE Development Objective E2 - Regulations & Codes |
Cardiff |
Book |
|
20th |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Birmingham |
Book |
|
25th |
ICE 2000 - 4000 Word Reports for CPR and MPR |
Bristol |
Book |
|
26th |
Bridge Assessment & Maintenance & Repair (2 days) |
Cardiff |
Book |
|
27th |
Bridge Assessment & Maintenance & Repair (2 days) |
Cardiff |
Book |
|
27th |
European Asphalt Standards & their Implementation in UK & Specifically within the Specification for Highway Works |
Belfast |
Book |
|
27th |
Starting with Eurocodes: EN 1990 & 1991 |
Birmingham |
Book |
|
27th |
Practical Highway Design - Introduction |
Glasgow |
Book |
|
June 2010 |
|
1st |
Managing the Design Process |
Cardiff |
Book |
|
8th |
Bills of Quantities for Highway Works |
Bristol |
Book |
|
9th |
H, S & W - ICE Development Objective E2 - Regulations & Codes |
Slough |
Book |
|
9th |
Bridge Assessment & Maintenance & Repair (2 days) |
Glasgow |
Book |
|
10th |
CDM Regulations 2007 and Compliance |
Cardiff |
Book |
|
10th |
Bridge Assessment & Maintenance & Repair (2 days) |
Glasgow |
Book |
|
15th |
NEC3 : Engineering and Construction Contract Advanced Workshop |
Bristol |
Book |
|
16th |
Practical Highway Design - Introduction |
Cardiff |
Book |
|
17th |
Urban Drainage (Foul and Surface Water) |
Birmingham |
Book |
|
22nd |
CDM Regulations 2007 for Designers - Design Risk Management |
Birmingham |
Book |
|
23rd |
Temporary Works - Introduction for Site Engineers/Supervisors |
Glasgow |
Book |
|
24th |
Interpreting Soil Test Results |
Cardiff |
Book |
|
29th |
Surface Water Culvert Design |
Cardiff |
Book |
|
29th |
Manual for Streets - Overview of the Design Document |
Bristol |
Book |
|
30th |
Eurocode 2 for Bridges - Theory with Design Workshops (2-day) |
Birmingham |
Book |
|
30th |
Traffic Signs Manual Chapter 8 - 2009 |
Belfast |
Book |
|
July 2010 |
|
1st |
Highway Drainage - An Overview |
Belfast |
Book |
|
1st |
Eurocode 2 for Bridges - Theory with Design Workshops (2-day) |
Birmingham |
Book |
|
6th |
H, S & W - ICE Development Objective E2 - Legislation |
Bristol |
Book |
|
6th |
Sheet Piling & Cofferdams - Construction |
Cardiff |
Book |
|
6th |
Principles of Construction Contracts (2 days) |
Glasgow |
Book |
|
7th |
Principles of Construction Contracts (2 days) |
Glasgow |
Book |
|
14th |
Oral Communication |
Cardiff |
Book |
|
15th |
New Roads and Street Works Act 1991(Part III) |
Glasgow |
Book |
|
15th |
H, S & W - ICE Development Objective E2 - Site & General Safety |
Birmingham |
Book |
|
20th |
Designing Steel Building Structures - EC3 (2 days) |
Belfast |
Book |
|
20th |
Design of Concrete Structures to EC2: Theory and Examples |
Birmingham |
Book |
|
21st |
ICE Written Assignment & the Attributes |
Bristol |
Book |
|
21st |
Concrete Technology - introductory course in concrete properties and materials |
Cardiff |
Book |
|
21st |
Design of Concrete Structures to EC2: Theory and Examples |
Birmingham |
Book |
|
21st |
Designing Steel Building Structures - EC3 (2 days) |
Belfast |
Book |
|
22nd |
Concrete Specification to BS EN 206 - 1 : 2000 AND BS 8500 : 2006 |
Cardiff |
Book |
|
28th |
ICE Chartered & Member Professional Review - Preparation Day |
Bristol |
Book |
|
29th |
Highway Drainage - An Overview |
Cardiff |
Book |
|
29th |
Pavement Design Using the DMRB |
Belfast |
Book |
|
August 2010 |
|
3rd |
Design of Retaining Walls to Eurocode 7 |
Birmingham |
Book |
|
4th |
Design of Timber Structures to Eurocode 5 - Solid Timber |
Cardiff |
Book |
|
5th |
Flood Risk Assessments |
Belfast |
Book |
|
10th |
Design of Concrete Structures to EC2: Theory and Examples |
Bristol |
Book |
|
11th |
ICE Written Assignment & the Attributes |
Glasgow |
Book |
|
11th |
Design of Concrete Structures to EC2: Theory and Examples |
Bristol |
Book |
|
18th |
ICE Chartered & Member Professional Review - Preparation Day |
Glasgow |
Book |
|
September 2010 |
|
1st |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Glasgow |
Book |
|
1st |
ICE Written Assignment & the Attributes |
Birmingham |
Book |
|
2nd |
Site Supervision of Civil Engineering Contracts - NEC |
Cardiff |
Book |
|
2nd |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Glasgow |
Book |
|
7th |
Bills of Quantities for Highway Works |
Belfast |
Book |
|
8th |
ICE Chartered & Member Professional Review - Preparation Day |
Birmingham |
Book |
|
13th |
Sheet Piling and Cofferdams - Design (1.5 days) |
Glasgow |
Book |
|
14th |
Sheet Piling and Cofferdams - Design (1.5 days) |
Glasgow |
Book |
|
15th |
Hydrology & Hydraulics of River Engineering - An Introduction (2 days) |
Birmingham |
Book |
|
15th |
H, S & W - ICE Development Objective E2 - Site & General Safety |
Cardiff |
Book |
|
16th |
Hydrology & Hydraulics of River Engineering - An Introduction (2 days) |
Birmingham |
Book |
|
28th |
Environmental Impact Assessments of Highway Schemes |
Cardiff |
Book |
|
30th |
H, S & W - ICE Development Objective E2 - Site & General Safety |
Glasgow |
Book |
|
October 2010 |
|
6th |
Site Investigation |
Cardiff |
Book |
|
7th |
ICE 2000 - 4000 Word Reports for CPR and MPR |
Belfast |
Book |
|
12th |
H, S & W - ICE Development Objective E2 - Legislation |
Birmingham |
Book |
|
14th |
Drainage Design (Foul and Surface Water) |
Glasgow |
Book |
|
20th |
Site Investigation |
Glasgow |
Book |
|
21st |
H, S & W - ICE Development Objective E2 - Regulations & Codes |
Bristol |
Book |
|
27th |
Bridge Assessment & Maintenance & Repair (2 days) |
Birmingham |
Book |
|
27th |
Design of Retaining Walls to Eurocode 7 |
Glasgow |
Book |
|
28th |
Bridge Assessment & Maintenance & Repair (2 days) |
Birmingham |
Book |
|
November 2010 |
|
2nd |
H, S & W - ICE Development Objective E2 - Site & General Safety |
Slough |
Book |
|
3rd |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Belfast |
Book |
|
4th |
CDM Regs 2007 - Role of the Coordinator (2 days) |
Belfast |
Book |
|
11th |
ICE 2000 - 4000 Word Reports for CPR and MPR |
Glasgow |
Book |
|
16th |
NEC3 : Engineering & Construction Contract - Introduction |
Glasgow |
Book |
|
23rd |
Sheet Piling & Cofferdams - Construction |
Glasgow |
Book |
|
December 2010 |
|
1st |
Sustainable Development and Sustainable Construction |
Glasgow |
Book |
|
2nd |
Contract Law - Types of Contract |
Belfast |
Book |
|
8th |
Design of Timber Structures to Eurocode 5 - Solid Timber |
Glasgow |
Book |
Our Written Assignment and Study Day courses are offered in January - February
- September.